Today we start the construction works of trench excavation under the gas pipeline project between Huy (Ben Ahin region) and Libramont Chevigny (Bras region), in Belgium.
Calaf Trenching will have drawn 11 km trench for a later installation of a steel pipe DN 500 mm.